- May 2012 - Jan 2013
- Greater London Authority
GABE was appointed directly by the Greater London Authority in March 2012 to undertake major restoration works to a 2KM stretch of the Thames River wall.
GABE was appointed directly by the Greater London Authority in March 2012 to undertake major restoration works to a 2KM stretch of the Thames River wall.